The start of 2025 was marked by the organisation and transport of a 98-tonne industrial press. This compact, heavy load called on every skill of our technical teams to organise the move and obtain the permits needed to carry it from Munich, Germany, to Dijon, France.
Our engineering office made this feat possible, and not only that, since the load’s configuration also required a load-securing study to calculate the chains and lashing tools needed to secure it on our 10-line modular trailer. No less than two months of upstream work went into making the project a reality.
Thanks to our escorts and the driver of this 150 t abnormal convoy, the load crossed Germany and part of France to be delivered to the client without a hitch.